Mandarin Road Sidewalk Improvements

Mandarin Road Sidewalk Improvements
Transportation/Municipal
Project Description: Construction services were provided for the installation of sidewalk along Mandarin Road between Orange Picker Drive and Bolton Abbey Road. The scope of work included site clearing and tree removal; sidewalk, entrance and drainage construction; and water line relocation. In an effort to prevent erosion, our team installed an 80-foot gravity wall along one edge of the road with matching handrail. Several mitered end sections and drainage grates were also installed along the length of the road.