Structural design for the existing floating docks system (approximately 30-40 feet) and the re-attachment of 3 existing gangways with ADA access. The intent of this project was to relocate the floating docks into deeper water, to make them usable at normal tides and to reduce the environmental impacts. Construction services for the including removal of existing concrete pilings, installation of new concrete pilings, relocation of existing floating docks, installation of a new floating dock, and construction of new fixed dock, dredging and ADA parking space conversion including blackout and restriping, removal of signage and cartoppers were also provided.
Jim King Park at Sisters Creek Dock Improvements
Projects

Project Information
Location
Jacksonville, FL
Client
City of Jacksonville