Roadway improvement project for the JTA Admin Building which included the demo of existing sidewalks and associated concrete curb with replacement of new curbing/sidewalk to meet ADA standards for the new traffic and pedestrian configuration. New pedestrian crosswalk was put into place along with pedestrian signals and mast arms for the signalized intersections at the Johnson/Bay Streets and Forsyth/Johnson Streets. In addition, we completed the mill and resurface of the surrounding roadways along Forsyth and Bay Street with new thermoplastic striping down to Jefferson Street. New applicable roadway signage was also installed along the corridor for the new traffic configuration. Traffic loops were also installed along Forsyth and Lee Streets in conjunction with the new signal and communications work.
JTA Admin Building
Projects

Project Information
Location
Jacksonville, FL
Client
JTA